Client Case Studies
We have gathered an extensive customer base over the years, boasting some of Ireland’s leading employers as our much appreciated clients:

Click here to learn more
- Heat Recovery Distribution Piping
- Natural Gas Pipe Modifications.
- Installation of New Salts Pre-pack Project

Click here to learn more
- New Production Facility
- New Boiler blowdown vessel installation
- Shutdown works
- Long term hire of Pipe Fitters

Click here to learn more
- Main water replacement piping
- Installation of Steam / Condensate Line
- Pipebridge between raw materials & tank farm
- Shutdown works
- Long term hire of Pipe Fitters

Click here to learn more
- Renew high level water curtain at Ringaskiddy
- Fabrication of personnel carrier container
- Refurbishment of Marine Loading Arms
- work on Gerry O’Sullivan Tug
- work in Tivoli & Ringaskiddy Ports

Click here to learn more
- Platform & Galv Supports
- Replace existing gas & vapor lines
- 6” Gasline replacement
- Painting of storage tanks / walkways
- Misc call out / general hire

Click here to learn more
- Bitumen Plant Redevelopment at Dublin Terminal
- Vapour Recovery Unit &Bottom Loading Gantry – Galway
- Cork Terminal Redevelopment
- Import Lines, Phase 1 and 2 – Dublin

Click here to learn more
We have completed many projects for Bord Gais Eireann over the years, here is just a few of the bigger projects we have undertaken :
- Exhaust Stack Replacement Project – Scotland
- High Voltage Earthing Project
- Midleton Compressor Station
Gas Pipelines
- Mayo Galway Towns
- Wyeth Co. Limerick
- Gas pipeline to the west AGI’s
- Ballincollig to Ballineen
- Caherlag to Ballincollig
- Sandyford/Bray
- Cork City 10″ Mullagh to Virginia
- Ballyborough, Co. Cavan
- NEP Phase 3
- Diversion of main Cork to Dublin Gas Pipeline
- Installation of Gas Power Supply to Remote Actuators in IFI
New AGI Installations
- Whitescross
- Huntstown
- Cooksland
- Brinny
- Ballineen
AGI Upgrades
- Cork
- Ballyveelish
- Southern Region Upgrades
- Caherlag
- Whitegate
- Limerick

Click here to learn more
- Chromatography Laboratory Installation
- Glycol System FMEA Upgrade
- P1 Capacity Upgrade Project
- P3 M3 CIP Skid Upgrade – Phase 1
- Dryer Centrifuge Project
- PHU Upgrade
- Reactor R008 Replacement
- Warehouse Extension
- P1 Scrubber – Dust Extract
- Mods to Mill M005
- TMC114 Installation
- MEP 04/05 Piperack install to new P3 bld
- Replacement of Reactor R4
- Water Treatment Plant Room Upgrade
- Condensate Line from P3 to P1
- Technical Services Building
- New CF-06 Centrifuge
- D007 Dryer Installation
- Central Cleaning Building

Click here to learn more
Pfizer Cork Ltd, Little Island, Cork.
- Replace Aeration Pipework in Tank 02
- P5 Vacuum Pump
- Lab Expansion Project – Phase 2
- Lab Upgrade Project – Phase 1
- EPI Capacity Upgrade Project
- P5 – Mechanical Works
- Latanaprost
- New SYN 1 Building – Mechanical Services
- Long term hire of pipe fitters
Pfizer Pharmaceutical, Little Island, Cork.
- Drying / Milling Project
Pfizer Pharmaceutical, Ringaskiddy, Cork.
- Hydrogenation Laboratory Upgrade Project
- Replacement of HCL Piping in PB2
- Installation of Drum to FIBC
- OSP 3 – Upgrade Solids Charging to DC705
- Relocate Lines – FIBC Charging in OSP1
- Long term hire of Pipe Fitters.

Click here to learn more
- Gas to Amgen
- N8 to Mitchelstown Gas Pipeline
- Ballynora to Lehenaghamore Gas Pipeline
- Caherlag to Ballincollig Gas Pipeline

Click here to learn more
- Gas Pipeline to the West & 16” Hot Tap

Click here to learn more
- Installation of 813M of Main Gasline
- AGI’s for Great Island Pipeline
- Pressure Testing of Gas Pipeline

Click here to learn more
- UG Gas Network System.at Whitegate Refinery- Mechanical Works
- Gas Pipeline to Tynagh Energy

Click here to learn more
- Kernan to Derryhale Gas Pipeline, Nth Ireland
- Aldi Distribution Project, Mitchelstown.
- Cork City & Country Bridge Rehabilitation

Click here to learn more
- Turnaround 2004
- SRU Upgrade Project
- Merox & Copper Sweetening
- Hydrofiner Piping Modifications
- Removal of T-205
- Surge Protection on HFO
- Jet Kero Rundown Piping
Contact Us
Murjoy Ltd.,
Lisnahorna,
Whitecross,
Co. Cork,
T23 VF77
Ireland.
Tel: +353 (0)21 4393656
Fax: +353 (0)21 4393721
Email: info@murjoy.ie